Summary of work carried out excluding automation and BMS installations on office arrangements
| Date of implementation | Object of implementation | Description of the implemented system |
|---|---|---|
| 06.2015-12.2015 | Building a BMS automation system for the Zielone Arkady Shopping Centre at 1 Wojska Polskiego Street in Bydgoszcz | Commissioning of the entire automation system from the Energoste mi range ventilation system, heat/cool nodes, electrical monitoring - working on a full-time basis at Energoster |
| 12.2015-07.2016 | Orange Town in Warsaw | Technical inspections of the building, troubleshooting related to the automation system and BMS - full-time job at Energoster |
| 06.2015-08.2016 | Office building Konstruktorska | Technical inspections, troubleshooting of the automation system and BMS - as subcontractor for Energoster |
| 06.2015-08.2016 | Office building Postępu 14 in Warsaw | Technical inspections, troubleshooting related to the automation system and BMS - Full-time work at Energoster |
| 08-2016- currently | Office building Postępu 14 in Warsaw | Carrying out automation and BMS installations on office arrangements - as subcontractor for Energoster |
| 06.2015-08.2016 | Office building GBC A and B on Inflancka Street in Warsaw | Technical inspections, troubleshooting related to the automation system and BMS - Full-time work at Energoster |
| 08.2016-present | Office building GBC A and B on Inflancka Street in Warsaw | Carrying out the installation of automation and BMS on office arrangements - commissioning of the installation - what subcontractor Energoster |
| 2016-2021 | SONATA waste water treatment plant belonging to Warsaw Chopin Airport | Inspection of control and measurement apparatus. Modernisation of installations, repairs, replacement of equipment |
| 2016-2017 | West Station 2 office building | Installation of a fire alarm system on levels -1, -2 -3 as a subcontractor for Zelrem |
| 2016-2017 | West Station 2 office building | Wiring and connection of ventilation dampers (levels -3/+13) cooling nodes, heat nodes, air handling units, electrical monitoring as subcontractor for Honeywell |
| 2016-2018 | West Station 2 office building | Installation of air-conditioning automation on the arrangements, working as a subcontractor commissioning testing on my side - the material was supplied by the principal company IBPS Tech. |
| 2017 | Proximo II | BMS installation, air-conditioning automation installations - which Zelrem subcontractor |
| 09.2017 | Pasaż Grunwaldzki shopping gallery in Wrocław | Work to restore the M-BUS remote meter reading system on levels -1, 0, 1, 2 As subcontractor for Energoster |
| 11.2017 | PTA ORLEN Plant in Włocławek | Installation of three air-handling units Supervision, wiring, installation of equipment, assistance with commissioning tests of the installation, taking measurements of electrical quantities as subcontractor for Energoster |
| 10.2017-12.2017 | Public kindergarten in Michałówka, Michałówka 3 08-400 Garwolin | Renovation of the electrical installation in the old part of the kindergarten. Design, supply of material, supervision, testing of installation, measurement of electrical quantities. |
| 10.2017-06.2018 | The Park building 5 at Orzechowa in Warsaw | Comprehensive implementation of the automation system and BMS. Provision of cabling, assembly of devices, connection assistance in the commissioning of the system as a subcontractor for Energoster |
| 2018 | The Park building 5 at Orzechowa in Warsaw | Installation of air-conditioning/monitoring automation in all office areas, including commissioning of the system, as subcontractor to Energoster |
| 02.2018 | Institute of Cardiology 42 Alpejska Str. Warsaw | Installation of air handling unit automation including cabinet assembly (supervision of cabling, installation of equipment, connection of equipment, assistance in commissioning), as subcontractor for Energoster |
| 05.2018-12.2019 | CH Nowa Stacja in Pruszków | Comprehensive execution of automation system and BMS installation, installation of cooling towers, heat and cooling nodes, electrical monitoring (supervision of cabling, installation of equipment, connection of equipment, assistance in commissioning) installation tests, execution of measurements of electrical quantities, as subcontractor for Energoster |
| 2018-2019 | Hospital in Rzeszów | Comprehensive installation of automation system and BMS, as subcontractor for Energoster |
| 12.2018-04.2019 | INTRACO at 2 Stawki Street in Warsaw | Upgrading the automation installation throughout the building; ventilation system, heat/cool node, electrical monitoring, replacement of e.e. meters plus wiring of communication buses, as subcontractor for Energoster |
| 2020-2022, currently installations on office arrangements | Rondo 1 office building at the UN Roundabout in Warsaw | Change of air-conditioning zone control system on arrangements throughout the building of Johnson Control controllers to Schneider SER8350 A0B00 system approx. 2500 units system commissioning including system integration Installation of communication networks, replacement of energy meters approx. 550 units Replacement of monitoring controllers from Johnson Control to Schneider RPC approx. 100 units including cabling in cabinets, as subcontractor for Energoster |
| 2020- currently | West Station 1 and West Station 2 office buildings | Installation of air-conditioning automation directly to the contracting companies, supply of prefabricated control box, Siemens RDG110 thermostat, wiring - testing commissioning, supervision of electrical works manager execution of technical documentation according to the building requirements |
| 01-03.2021 | Exatel located at 47 Perkuna Street in Warsaw | Modernisation of the automation and BMS of the air-conditioning system, change of the control system. Wiring of buses and communication signals, replacement of controllers in ventilation cabinets and electrical monitoring |
| 02-05.2021 | Aviation Institute at Chopin Airport | Installation of automation and BMS in buildings T and T3 |
| 05.2021-09.2022 | Construction of a service station for a specialised sewer cleaning vehicle in Marki | Installation of electrical, CCTV, Intrusion Detection and Control (CCTV) and access systems Testing of installations, measurement of electrical quantities, as subcontractor for Energoster |
| 06.2021-11.2021 | Office building PZO2- Praga in Warsaw | Construction of cable routes and installation of equipment: CCTV, KD, gas detection, as subcontractor of Wibar company |
| 2021- currently | Warehouse halls "Żerań" in Warsaw and office on Gen Zajączka Street in Warsaw | Installation of test facilities for IT equipment, testing of IT equipment, upgrading of lighting in the warehouse, technical inspections of buildings directly for Egida IT Sp. z o.o. Maintenance, servicing of buildings |
| 01.12.2021-15.03.2022 | Chrzanów Duży Sewage Treatment Plant | Carrying out assembly work for electrical and instrumentation systems, as subcontractor to Energoster |
| 15.03.2022 12.2022 | Wastewater treatment plant Zyrardow | Installation of street lighting, CCTV aerial line, access control including measurement of electrical quantities, as subcontractor to Energoster |
| 01.2023 | Arrangement by Arup- GBC B at Inflancka in Warsaw | Installation work, installation of FCU, VAV control, electrical monitoring, etc. |
| 01-04.2023 | Arrangement of Mazovia GBC A, GBC B on Inflancka Street in Warsaw | Installation of automation and BMS, installation including commissioning. Total area approx. 6000m2 - five floors |
| 04-06.2023 | Arrangement of Biedronka 6P at 3 Dolna Street in Warsaw | Full range of electrical work. |
| 06.2023 | Arrangement of Unimot 6P West Station II on Jerozolimskie Avenue in Warsaw | Installation of automation and BMS, full scope, supply of materials, installation plus commissioning. |
| 07.2023 | Arrangement of CPK 8P West Station II at Jerozolimskie Avenue in Warsaw | Installation of automation and BMS, full scope, supply of materials, installation plus commissioning. |
| 08.2023 | Facebook arrangement 31P Rondo 1 in Warsaw | Carrying out installation work in the field of automation and BMS, assistance with commissioning of the installation |
| 09.2023 | Paper factory -Mondi Mszczonów | Installation of cabling, assembly of equipment for VTS air-handling units Commissioning of the installation, Electrical measurements |
| 10.2023 | PBW Duchnice | Installation, wiring of the air handling unit, assembly of the equipment, sewing of the cabinet |
| 11.2023 | Installation of the training and didactic facility in BSPiIR SGSP in Nowy Dwór Mazowiecki | Installation of the heating control system, sewing in of the BMS management cabinet |
| 11.2023 | Crown Point, Prosta 70 in Warsaw | Implementation of works related to changing the control system of air-conditioning zones, Floor 6 and Floor 7 |
| 12.2023 | Brudnow Hospital in Warsaw | Modernisation of VTS air handling unit automation, supply of control cabinet, installation and commissioning. |
| 01.2024 | Military Complex No. 8602 Lieutenant General Tadeusz Buk Legionowo | Wiring, installation of equipment for VTS air handling units commissioning of the system. Distribution of cabling and connections in the heat centre. Carrying out electrical measurements |
| 02.2024 | Gocław Gallery - Well Fitness | Installation of cabling, three air-handling units, installation of peripherals, prefabrication of cabinets, installation of commissioning |
| 03.2024 | Wola Center, Przyokopowa 33, TATA arrangement | Installation of automation system for CO2-dependent control of VAV zones, prefabrication of cabinets, installation, commissioning. Control of emergency ventilation, server room, supply of cabling, prefabrication of cabinets, installation, commissioning |
| 04.2024 | Military Complex No. 8602 Lieutenant General Tadeusz Buk Legionowo | Voltage distribution of air handling unit, dehumidifier, humidifier, 4 sets, prefabrication of switch cabinets, installation commissioning. |
| 05.2024 | Affidea stage I, 43d Podgórna Street, Zielona Góra, | Construction of the emergency cooling system for MRI, supply of equipment, prefabrication of the cabinet, assembly, commissioning of the system. Execution of emergency ventilation, delivery of equipment, prefabrication of control cabinets, installation start-up. Execution of emergency ventilation of the Faraday cage, delivery of equipment, prefabrication of the control cabinet, installation, commissioning of the system. |
| 06.2024 | West Station 1 and West Station 2 office buildings | Installation of automatic activation of circulation pumps at the cooling tower circuit filters depending on the operation of the cooling units |
| 06.2024 | Affidea, Murarska 2, Legnica | Construction of the emergency cooling system for MRI, supply of equipment, prefabrication of the cabinet, assembly, commissioning of the system. Execution of emergency ventilation, delivery of equipment, prefabrication of control cabinets, installation start-up. Execution of emergency ventilation of the Faraday cage, delivery of equipment, prefabrication of the control cabinet, installation, commissioning of the system. |
| 07.2024 | Affidea stage II, Podgórna 43d, Zielona Góra | Construction of the emergency cooling system for MRI, supply of equipment, prefabrication of the cabinet, assembly, commissioning of the system. Execution of emergency ventilation, delivery of equipment, prefabrication of control cabinets, installation start-up. Execution of emergency ventilation of the Faraday cage, delivery of equipment, prefabrication of the control cabinet, installation, commissioning of the system. |
| 08.2024 | SAX, West Station II | Installation of automation control system, fancoil arrangement SAX West Station II |
| 08.2024 | Softinet West Station II | Installation of fancoil automation on the arrangement |
| 09.2024 | Biedronka, Bielsk Podlaski | Installation of air handling unit automation, temperature monitoring, control of domestic fans, etc. |
| 09.2024 | West Station I, West Station II | Modernisation of the bypass filter flushing system (Lakos) on chilled water plant |
| 09.2024 | West Station I | Modernisation of the drycooler control system |
| 10.2024 | Giełdowa 9, Warsaw | Installation of fancoil automation on the layout |
| 10.2024 | Ascensia, West Station II | Installation of fancoil automation on the arrangement |
| 11.2024 | EY 17P Roundabout 1 | Electrical installation on the arrangement |
| 11.2024 | Diebold West Station II | Installation of fancoil automation on the arrangement |
| 12.2024 | Meta, Roundabout1 | Installation of fancoil automation on the arrangement, installation of air handling unit automation. |
| 12.2024 | Unimot, West Station II | Installation of fancoil automation on the arrangement |
| 01.2025 | ENGEL | Installation of air handling unit automation |
| 01.2025 | SKRA Warsaw | Installation of air handling unit automation |
| 02.2025 | Wola Park 22- PHO | Smoke extraction, fire alarm system - cable routes |
Automation cabinet for modernisation of the VTS air handling unit control system
Modernisation of a VTS air handling unit
Automation cabinet for modernisation of the VTS air handling unit control system
Modernisation of the VBW air handling unit
VBW air handling unit control cabinet
Hybrid system for emergency ventilation
Affidea Zielona Góra MRI emergency cooling cabinet 1st stage
Cabinet for automatic emergency cooling of the Affidea Zielona Góra MRI 2nd stage
Automation system of the magnetic resonance engine room Affidea Zielona Góra 1st stage
Automation systems of the magnetic resonance engine room Zielona Góra 2nd stage
Affidea Legnica magnetic resonance emergency cooling cabinet
Control panel for management and monitoring of the Affidea Green MRI emergency walking system Phase I
BMS automation cabinet for the municipal waste incineration plant in Warsaw
Power distribution 36kW, Tadeusz Buk Military Unit in Legionowo
Power distribution 80kW, Tadeusz Buk Military Unit in Legionowo